top of page
Search
  • Gritblasting UK

Happy Christmas from Gritblasting UK

Its been a very busy year for us, and we now take a moment to look back at the variety and quantity of work we've been able to do for our clients this year. As well as launching our concrete floor preparation division, we have travelled the UK with our mobile blasting units, and continue to provide local contracted services from our blasting facilities at Devizes and Andover.

In addition to our concrete floor preparation work, we have completed surface preparation on a vast range of other structures and vessels. These include fire escapes, water containers, steels, steel bridges, lorry bodies, stone work, and vehicles such as gritters. We've even worked on a recycling plant elevator which was being refurbished.


One new aspect of our work this year has been outdoor sculptures. At Warwick university, we blasted and repainted an external sculpture, and in recent weeks have completed the surface preparation for one of the bronze sculptures at The Sculpture Park in Surrey.

Its been a varied and exciting year, and we look forward to 2022.


If you have an upcoming project that requires surface preparation, do give us a call.


We wish all our clients, partners and suppliers and your families a safe and Happy Christmas from us all at Gritblasting UK.


27 views0 comments
bottom of page